about us

 

HSE

Tanjung Perak Port, Indonesia's second largest port, has a strategic role in supporting East Java's economic growth, especially in non-oil and gas industry and commodities. Economic Growth of East Java in the Year 2009 to 2012, always higher percentage compared with National Economic Growth. The average growth rate is 0.52% above National Growth. In addition, Tanjung Perak Port is also the center of goods distribution throughout Eastern Indonesia Region (figure 1.1). This is what makes the service user port in Surabaya in particular, require more effective and efficient service from port service providers so that the distribution of goods to be faster, safer and with adequate cost.

Tanjung Perak Port, under the management of PT Pelindo III (Persero) with 7 other regions, including Central Java (Semarang, Cilacap), Central Kalimantan (KUMAI, Pangkalan Bun, Sukamara, Bumiharjo, SAMPIT, Kuala Pembuang, Samuda, Pagatan-Mendawai, Bagendang, Pulang Pisau, Kuala Kapuas, Bahaur), South Kalimantan (BANJARMASIN, Basirih, KOTABARU, Pagatan, Great Stone Mountain, Batulicin, Satui, Stagen, Mekar Putih), West Nusa Tenggara (LEMBAR, BIMA, Badas), East Nusa Tenggara (TENAU / KUPANG, Kalabahi, Waingapu, MAUMERE, Ende, Ippi) and Bali (BENOA, CLK BAWANG).

However, with the potential for positive growth, Tanjung Perak Port found considerable challenges, namely the increasingly crowded queue of goods distribution flow. In 2009, container flow in PT Pelindo III (Persero) was recorded at 2.9 million TEU's or 2.4 million boxes. While in 2010 as many as 3.2 million TEU's or 2.6 Million Boxes. In 2011, PT Pelindo III (Persero) recorded 3.6 million TEU's or 2.9 million boxes. And 2012 as many as 3.9 million TEU's or 3.3 million boxes. While in 2013, PT Pelindo III (Persero) record the flow of containers as much as 4 million TEU's or 3.5 million boxes. The achievement of the year 2013 is still dominated by Tanjung Perak Port with 2.8 million TEU's, followed by 450 thousand TEU Semarang Container Terminal and the Banjarmasin Container Terminal of 295 thousand TEU's. The rest is spread over other Pelindo III areas.

The results achieved in the period is not comparable with the capacity of PT Pelindo III (Persero). In 2012 alone, the capacity of PT Pelindo III (Persero) in container flow is only 2.1 million TEU's. Whereas the current demand for containers and achievements is 3.9 million TEU's. This means a deviation of 1.8 million TEU's within a year (figure 1.2.). Resulting in heavy queues and high logistics costs. If the condition is left it will certainly give negative impact and bad tendency for logistic world in Indonesia. In addition, the trend of container and other production flows continues to increase from year to year.

For that reason, PT Pelindo III (Persero), together with the region in its environment, develops its business potential and expands its service area by building new ports which are expected to decompose the density of the production flow of goods, and provide services with adequate capacity, equipment and facilities. One of them, PT Lamong Bay Terminal. PT Lamong Bay Terminal is a subsidiary of PT Pelindo III (Persero) which was established on December 31, 2013 and then, is to provide answers to the major challenges of goods production flow, especially in Eastern Indonesia (KTI). Lamong Bay Terminal Development is included in Masterplan Economic Development Acceleration and Expansion (MP3I). With the construction and operation of Lamong Bay Terminal, it is expected to reduce the waiting time (queue) of the Ship at Tanjung Perak Port in particular, as the gateway of East Java and Eastern Indonesia's economy.

alert and report
vessel schedule
next page CSR

VESSEL SCHEDULES

 

01

TANTO BERSINAR 107 / 108

ETB : 20/05/2020 07:00

ATB : 20/05/2020 05:18

ETD : 29/05/2020 13:00

ATD : -

Open Stack : 14/05/2020 07:00

Closing Time Container :

29/05/2020 03:00

02

FORTUNE SUNNY V071 / V071

ETB : 22/05/2020 04:00

ATB : 22/05/2020 07:25

ETD : 29/05/2020 04:00

ATD : -

Open Stack : 17/05/2020 04:00

Closing Time Container :

22/05/2020 00:00

03

MENTARI SAHABAT 2520 / 2520

ETB : 26/05/2020 08:00

ATB : 26/05/2020 08:30

ETD : 31/05/2020 20:00

ATD : -

Open Stack : 21/05/2020 08:00

Closing Time Container :

01/06/2020 08:00

04

LINTAS BARITO LB1020S / LB1020N

ETB : 29/05/2020 08:00

ATB : 29/05/2020 00:01

ETD : 29/05/2020 14:00

ATD : -

Open Stack : 24/05/2020 08:00

Closing Time Container :

29/05/2020 00:00

05

NEW GLORY 2004I / 2005

ETB : 29/05/2020 11:00

ATB : -

ETD : 29/05/2020 20:00

ATD : -

Open Stack : 24/05/2020 11:00

Closing Time Container :

29/05/2020 05:00

06

PULAU NUNUKAN 18/20 / 19/20

ETB : 29/05/2020 16:00

ATB : -

ETD : 30/05/2020 05:00

ATD : -

Open Stack : 23/05/2020 16:00

Closing Time Container :

29/05/2020 10:00

07

KMTC JEBEL ALI 2005S / 2005N

ETB : 30/05/2020 06:00

ATB : -

ETD : 31/05/2020 02:30

ATD : -

Open Stack : 25/05/2020 06:00

Closing Time Container :

30/05/2020 00:00

08

SUNGAI MAS 4020W / 4020W

ETB : 30/05/2020 08:00

ATB : -

ETD : 31/05/2020 18:30

ATD : -

Open Stack : 25/05/2020 08:00

Closing Time Container :

30/05/2020 02:00

09

MERATUS DILI 2006 / 2007

ETB : 30/05/2020 08:00

ATB : -

ETD : 31/05/2020 02:30

ATD : -

Open Stack : 25/05/2020 08:00

Closing Time Container :

30/05/2020 02:00

10

MERATUS BORNEO 2023 / 2024

ETB : 30/05/2020 09:00

ATB : -

ETD : 31/05/2020 01:30

ATD : -

Open Stack : 25/05/2020 09:00

Closing Time Container :

30/05/2020 03:00

11

PRATIWI RAYA 12/20 / 13/20

ETB : 30/05/2020 16:00

ATB : -

ETD : 31/05/2020 04:30

ATD : -

Open Stack : 25/05/2020 16:00

Closing Time Container :

30/05/2020 10:00

12

FLORES SEA 207 / 207

ETB : 31/05/2020 02:00

ATB : -

ETD : 01/06/2020 00:30

ATD : -

Open Stack : 26/05/2020 02:00

Closing Time Container :

30/05/2020 20:00

13

ORIENTAL JADE 07/20 / 07/20A

ETB : 31/05/2020 08:00

ATB : -

ETD : 01/06/2020 08:30

ATD : -

Open Stack : 26/05/2020 08:00

Closing Time Container :

31/05/2020 12:00

14

GULF MAS 3220 / 3220

ETB : 31/05/2020 08:00

ATB : -

ETD : 01/06/2020 03:30

ATD : -

Open Stack : 26/05/2020 08:00

Closing Time Container :

31/05/2020 02:00

15

KEDUNG MAS 3020 / 3020

ETB : 31/05/2020 10:00

ATB : -

ETD : 01/06/2020 01:30

ATD : -

Open Stack : 26/05/2020 10:00

Closing Time Container :

31/05/2020 04:00

16

MENTARI CRYSTAL 2420 / 2420

ETB : 31/05/2020 12:10

ATB : -

ETD : 01/06/2020 08:40

ATD : -

Open Stack : 26/05/2020 12:10

Closing Time Container :

31/05/2020 06:10

17

LINTAS HARUAN LHN004S / LHN004N

ETB : 02/06/2020 06:00

ATB : -

ETD : 02/06/2020 06:30

ATD : -

Open Stack : 27/05/2020 06:00

Closing Time Container :

02/06/2020 00:00

18

SPIL NIKEN 06/20 / 06/20A

ETB : 02/06/2020 08:00

ATB : -

ETD : 02/06/2020 08:30

ATD : -

Open Stack : 27/05/2020 08:00

Closing Time Container :

02/06/2020 02:00

19

SEGARA MAS 4420 / 4420

ETB : 03/06/2020 08:00

ATB : -

ETD : 04/06/2020 18:30

ATD : -

Open Stack : 29/05/2020 08:00

Closing Time Container :

31/05/2020 02:00

20

AS CONSTANTINA 2005S / 2005N

ETB : 03/06/2020 08:00

ATB : -

ETD : 04/06/2020 03:30

ATD : -

Open Stack : 29/05/2020 08:00

Closing Time Container :

03/06/2020 02:00

21

PEKAN RIAU 16/20 / 17/20

ETB : 03/06/2020 16:00

ATB : -

ETD : 04/06/2020 02:30

ATD : -

Open Stack : 29/05/2020 16:00

Closing Time Container :

03/06/2020 10:00

22

YM ELIXIR 108S / 108N

ETB : 04/06/2020 06:00

ATB : -

ETD : 05/06/2020 16:30

ATD : -

Open Stack : 30/05/2020 06:00

Closing Time Container :

04/06/2020 00:00

23

HONGKONG BRIDGE 0048S / 0048N

ETB : 06/06/2020 06:00

ATB : -

ETD : 07/06/2020 04:30

ATD : -

Open Stack : 01/06/2020 06:00

Closing Time Container :

06/06/2020 00:00

WhatsApp Connect

 

LIVE CHAT

QUICK INQUIRIES

CAPTCHA Image
Play CAPTCHA Audio
Refresh Image